Back

Nigeria’s power plants operated at 31% capacity in April — NERC

Nigeria’s power plants operated at 31% capacity in April — NERC

Nigeria’s grid-connected power plants operated at just 31 per cent of their installed capacity in April 2026, with average available generation standing at 4,286 megawatts (MW) out of a total installed capacity of 13,625MW. This is the key highlight of the latest operational performance factsheet pu...

Bookmark 0 0
Sentiment: Positive ( 0.34 ) Bias: Neutral

Fact-Checked Information

Source: Google Fact Check Tools
Reliability: Unknown
Notes: No fact-checks found for this content
Verified on May 08, 2026

Comments